Measurements checked
We check clearances, access and fitting conditions before the drawings are signed off.
Survey, design, manufacture and fitting
The space beneath a basin looks generous until you open a drawer. The trap, pipes and shut-off valves take up depth, and a cupboard door does not always make the remainder easy to use.
We look at the furniture in use: door swing, cleaning, capacity and the parts of the room that cannot move.
We check clearances, access and fitting conditions before the drawings are signed off.
The quote sets out boards, finishes, fittings and the installation scope.
Furniture and any separate building work are identified in the proposal.
Your project contact answers questions and coordinates the agreed stages.
We move from an initial price guide to a quotation based on measured dimensions, then manufacture, fit and check the furniture with you.
Send photos, rough dimensions, the address and a note about what the furniture must do. We can discuss a price range before measuring.
At the property we check walls, services, clearances and the route for bringing the pieces in. These measurements replace the first estimates.
We develop the layout and project drawings if the job requires them. They are free when you order the manufacture of that project from us.
The agreed layout, boards, finishes, fittings and installation appear in a written quotation with the final price.
You can review the specification before accepting it. The agreed deposit then starts the manufacturing order.
We prepare the pieces to the approved dimensions and check the details needed for delivery and fitting.
The team installs the furniture and adjusts doors, drawers, joints and visible finishing details.
We test how the furniture opens and works together, inspect the finish and record any final adjustment.

I'm Patricia Méndez. Send me a photo of your space and tell me what you would like to change. I'll help you think through the layout, storage and next steps.
No obligation. Rough measurements are enough to get started.
Basin type and pipe positions determine the internal arrangement.
The opening around the trap follows the real installation and leaves storage at the sides.
A shallower unit may preserve the route in front while still holding daily items.
The back and service openings allow the connections to be maintained.
Photo collection Furniture inspiration from MMV Estudio
View on Instagram
Photo collection Furniture inspiration from MMV Estudio
View on Instagram
Photo collection Furniture inspiration from MMV Estudio
View on Instagram
Photo collection Furniture inspiration from MMV Estudio
View on Instagram
Photo collection Furniture inspiration from MMV Estudio
View on Instagram
Photo collection Furniture inspiration from MMV Estudio
View on InstagramSixteen photographs from MMV projects in different Spanish cities. Tell us which detail you would adapt to your room in Alicante.
A change to one can alter the dimensions of the others.
The waste position and basin support become design inputs rather than fitting-day surprises.
A countertop bowl and an integrated basin leave different heights and travel for drawers.
Before proposing a floating cabinet, we inspect the support and access to pipework.
Rough details are enough to start.
Show the basin, trap and shut-off valves.
Measure clear space around the pipework.
Say which drawers need full extension.
Clarify whether basin, worktop and tap are already chosen.
We clarify use, scope and missing details.
Price and fitting after decisions are checked.

A surface, its supporting board, edges and hardware need to work together.
The chosen material sheet sets out performance and care.
Yes, if the basin, trap and valves still fit and can be maintained. We also check drawer travel and the passage in front.
Send photographs of the basin and connections, and available dimensions. We will review the details and explain the next step.
Before promising two full drawers, we measure the trap, supply pipes and shut-off valves. A well-placed cut-out leaves storage on either side; a large one wastes the unit. If the basin stays, its current size and height set the plan. If it changes, we choose basin and cabinet together so the worktop does not leave the drawers unable to travel.
The room also places demands on the outside. We check the shower distance, where splashes reach and how the floor is cleaned. For a wall-mounted design we establish what the supporting wall is made from before specifying anchors. Board, edging and finish follow that information, not a colour sample alone.
The quotation distinguishes cabinetry, worktop, basin and taps according to what is actually included, with plumbing clarified separately. Send photos of the open unit, the trap and the wall, plus rough measurements. We can then say what needs checking before pricing.